After two days of evaluating launch preparations for the mission, the group has confirmed the readiness of the shuttle, flight crew and payload for the next flight to the International Space Station.
Bill Gerstenmaier, associate administrator for Space Operations said there are very few issues being worked and the shuttle is ready to go. He stressed the16-day mission will be complex for the crew with five spacewalks to continue expansion of the station.
"It was a very thorough review, we covered lots information, lots of data," said Gerstenmaier. "The teams are truly ready."
"It’s a tribute to the teams that they worked so well with the vehicle... they've done a phenomenal job."
"We're right on the timeline," said Mike Leinbach, space shuttle launch director. "Endeavour is doing really well and we're ready to launch on the eleventh."
The crew will deliver the first segment of a Japanese laboratory complex called Kibo, plus a new Canadian robotics system to complement the station's robot arm.
The flight is commanded by Dominic Gorie with Gregory H. Johnson serving as Pilot. The crew also includes Mission Specialists Rick Linnehan, Robert L. Behnken, Mike Foreman, Garret Reisman and Japanese astronaut Takao Doi.
Source: NASA
Related stories:
Hubble enters safe mode
At approximately 02:00 CEST on Sunday, 28 September, the NASA/ESA Hubble Space Telescope automatically entered safe mode when errors were detected in the Control Unit/Science Data Formatter-Side A.
Successful re-entry marks bright future for ATV
Europe’s first Automated Transfer Vehicle (ATV) Jules Verne successfully completed its six-month ISS logistics mission today with its controlled destructive re-entry over a completely uninhabited area of the South Pacific.
NASA delays repair mission to Hubble telescope (Update 2)
(AP) -- NASA said Monday it is delaying its mission to the Hubble Space Telescope until next year because of a serious breakdown of the observatory in orbit.
NASA at 50: still taking science to the limit
In 50 years, NASA has earned itself an unparalleled reputation as an engineering, technological and scientific pioneer by pushing science to the limit.
New Target Shuttle Launch Dates Announced as Astronauts Complete Rehearsal
The target launch date for space shuttle Atlantis' STS-125 mission to service the Hubble Space Telescope has been reset to Oct. 14 at 10:19 p.m. EDT. A news conference is scheduled for Friday, Oct. 3, at NASA's Kennedy Space Center in Florida to announce an official launch date.
Shuttle Atlantis Rolls to Launch Pad for Hubble Mission
At 9:19 a.m. EDT this morning, space shuttle Atlantis began its slow trek from Kennedy Space Center's massive Vehicle Assembly Building to Launch Pad 39A, a journey that should take approximately six hours.
Space Shuttle Atlantis To Move To Launch Pad Saturday
(PhysOrg.com) -- Space shuttle Atlantis is scheduled to roll out to Launch Pad 39A at NASA's Kennedy Space Center on Saturday, Aug. 30. Atlantis is targeted to lift off Oct. 8 to repair the Hubble Space Telescope.
External Tank, Solid Rocket Boosters, Readied for Next Shuttle Launch
External tank ET-127 and the twin solid rocket boosters, which will fly with space shuttle Atlantis on the next shuttle mission, were joined Aug. 3 at NASA's Kennedy Space Center, Fla. The next processing milestone will be the attachment of the external tank and boosters to Atlantis, scheduled Aug. 18. STS-125, the fifth and final servicing mission to the Hubble Space Telescope, is scheduled to launch from the Kennedy Center on Oct. 8 at 12:34 a.m. CDT.