[Home]   [Full version]  

Shuttle ready for piggy-backed plane ride

Jun 26 ,Space & Earth science


NASA scientists readied space shuttle Atlantis for a "piggy-backed" ride atop a Boeing 747 airplane this week to the Kennedy Space Center.

That journey will cap shuttle's STS-117 mission that officially ended Friday when it landed at Edwards Air Force Base in California.

Known as a ferry-flight, the orbiter will make the cross-country trip in one or two days, depending on weather conditions. The first leg is set for Friday.

The STS-117 mission started with a June 8 launch, arriving at the International Space Station June 10. The crew conducted four spacewalks to continue the station's construction, as well as repairing part of the shuttle's thermal blanket,w which was damaged during launch.

The return to Earth ended astronaut Suni Williams' record for the longest spaceflight by a woman: 194 days, 18 hours and 58 minutes.

The next shuttle mission is slated to launch in August.

Copyright 2007 by United Press International

Related stories:

Shuttle Atlantis Rolls to Launch Pad for Hubble Mission
At 9:19 a.m. EDT this morning, space shuttle Atlantis began its slow trek from Kennedy Space Center's massive Vehicle Assembly Building to Launch Pad 39A, a journey that should take approximately six hours.
Eyes turn to dawn of 'visual computing'
Lifelike graphics are breaking free of elite computer games and spreading throughout society in what industry insiders proclaim is the dawning of a "visual computing era."
Space Shuttle Atlantis To Move To Launch Pad Saturday
(PhysOrg.com) -- Space shuttle Atlantis is scheduled to roll out to Launch Pad 39A at NASA's Kennedy Space Center on Saturday, Aug. 30. Atlantis is targeted to lift off Oct. 8 to repair the Hubble Space Telescope.
Spectrograph Team Awaits October Hubble Servicing Mission
A $70 million instrument designed by the University of Colorado at Boulder that will be inserted on the Hubble Space Telescope during an October 2008 servicing mission should help astronomers better understand how galaxies, stars and planets evolved.


Space Shuttle successor will not fly before 2014: NASA
NASA announced it has pushed back the launch of the Orion, the spacecraft designed to replace the agency's aging space shuttle fleet, by one year to 2014.
External Tank, Solid Rocket Boosters, Readied for Next Shuttle Launch
External tank ET-127 and the twin solid rocket boosters, which will fly with space shuttle Atlantis on the next shuttle mission, were joined Aug. 3 at NASA's Kennedy Space Center, Fla. The next processing milestone will be the attachment of the external tank and boosters to Atlantis, scheduled Aug. 18. STS-125, the fifth and final servicing mission to the Hubble Space Telescope, is scheduled to launch from the Kennedy Center on Oct. 8 at 12:34 a.m. CDT.
Space Shuttle External Tank ET-128 Sets New Performance Standard During STS-124 Mission
When NASA's space shuttle Discovery launched from NASA's Kennedy Space Center, Fla., May 31, it was lifted from the launch pad with the help of a "new" external fuel tank, ET-128, which featured design changes made to improve performance and flight safety.
NASA sets date for final shuttle mission in 2010
Following a detailed, integrated assessment, NASA selected target launch dates for the remaining eight space shuttle missions on the current manifest in 2009 and 2010.

News discussion:

Space & Earth science news

[Home]   [Full version]