NASA managers officially are targeting Sept. 10, 2008, for the launch of the fifth and final space shuttle servicing mission to the Hubble Space Telescope. During the 11-day flight, Atlantis' seven astronauts will repair and improve the observatory's capabilities through 2013.
Mission planners have been working since last fall, when the flight was announced, to determine the best time in the shuttle manifest to support the needs of Hubble while minimizing the impact to International Space Station assembly. NASA also will support a "launch on need" flight during the Hubble mission.
In the unlikely event a rescue flight becomes necessary, shuttle Endeavour currently is planned to lift off from Launch Pad 39-B at NASA's Kennedy Space Center, Fla. However, managers constantly are evaluating the manifest to determine the best mission options.
Shuttle missions beyond the Hubble flight still are being assessed. Shuttle and station program officials will continue to consider options for the remainder of the shuttle flights to complete construction of the space station by 2010, when the fleet will be retired. Those target launch dates are subject to change.
Source: NASA
Related stories:
NASA at 50: still taking science to the limit
In 50 years, NASA has earned itself an unparalleled reputation as an engineering, technological and scientific pioneer by pushing science to the limit.
New Target Shuttle Launch Dates Announced as Astronauts Complete Rehearsal
The target launch date for space shuttle Atlantis' STS-125 mission to service the Hubble Space Telescope has been reset to Oct. 14 at 10:19 p.m. EDT. A news conference is scheduled for Friday, Oct. 3, at NASA's Kennedy Space Center in Florida to announce an official launch date.
Spectrograph Team Awaits October Hubble Servicing Mission
A $70 million instrument designed by the University of Colorado at Boulder that will be inserted on the Hubble Space Telescope during an October 2008 servicing mission should help astronomers better understand how galaxies, stars and planets evolved.
External Tank, Solid Rocket Boosters, Readied for Next Shuttle Launch
External tank ET-127 and the twin solid rocket boosters, which will fly with space shuttle Atlantis on the next shuttle mission, were joined Aug. 3 at NASA's Kennedy Space Center, Fla. The next processing milestone will be the attachment of the external tank and boosters to Atlantis, scheduled Aug. 18. STS-125, the fifth and final servicing mission to the Hubble Space Telescope, is scheduled to launch from the Kennedy Center on Oct. 8 at 12:34 a.m. CDT.
Space Shuttle External Tank ET-128 Sets New Performance Standard During STS-124 Mission
When NASA's space shuttle Discovery launched from NASA's Kennedy Space Center, Fla., May 31, it was lifted from the launch pad with the help of a "new" external fuel tank, ET-128, which featured design changes made to improve performance and flight safety.
NASA sets date for final shuttle mission in 2010
Following a detailed, integrated assessment, NASA selected target launch dates for the remaining eight space shuttle missions on the current manifest in 2009 and 2010.
Shuttle Discovery Glides Home After Successful Mission
With Commander Mark Kelly and Pilot Ken Ham at the controls, space shuttle Discovery descended to a smooth landing at Kennedy Space Center, Fla. The STS-124 crew concluded their successful assembly mission to the International Space Station when the shuttle landed at 11:15 a.m. EDT.
Astronauts to talk with selected students
The U.S. space agency says some U.S. students will be talking this week with the astronauts who will service the Hubble Space Telescope.