Circling the globe aboard space shuttle Endeavour, the STS-123 crew members have completed their first full day in space. The astronauts inspected the orbiter’s heat shield and prepared for their arrival at the International Space Station tonight at 11:25 p.m. EDT.
Crew members used the shuttle’s robotic arm and Orbiter Boom Sensor System (OBSS) to check out the underside of Endeavour and the leading edges of its wings. The purpose of this inspection was to ensure that, during the vehicle’s climb to orbit, no damage occurred to the tiles that protect Endeavour from the heat of reentry.
Endeavour’s crew also extended the Orbiter Docking System Ring and checked out rendezvous tools in preparation for their arrival at the station.
The STS-123 astronauts checked out spacesuits they will use during the mission’s five scheduled spacewalks at the station. Three of these will include tasks devoted to assembly of Dextre, the Canadian Space Agency’s newest contribution to the station and the final element of its Mobile Servicing System, and installation of related equipment. The spacewalkers also will work to unberth from Endeavour’s payload bay the Japanese Logistics Module - Pressurized Section, the first element of the Japan Aerospace Exploration Agency’s Kibo laboratory.
Other spacewalk activities include the installation of spare parts, tools and a materials experiment, as well as the replacement of a circuit-breaker box and demonstration of a repair procedure for tiles of the shuttle’s heat shield. The astronauts also will stow the OBSS onto the station’s main truss during the fifth spacewalk.
Source: NASA
Related stories:
NASA sets date for final shuttle mission in 2010
Following a detailed, integrated assessment, NASA selected target launch dates for the remaining eight space shuttle missions on the current manifest in 2009 and 2010.
Testing, Radiation Testing: Northwestern Transistors On Space Station
Transistors based on a new kind of material created by Northwestern University researchers have been lifted into outer space on the space shuttle Endeavour and attached to the outside of the International Space Station for radiation testing.
Space station gets big Japanese lab room
Astronauts have attached a bus-sized Japanese laboratory to the International Space Station, giving the orbiting outpost its biggest room and providing Japan with a key foothold in space.
NASA Updates Space Shuttle Target Launch Dates
NASA Thursday adjusted the target launch dates for two space shuttle missions in 2008. Shuttle Atlantis' STS-125 mission to the Hubble Space Telescope is now targeted for Oct. 8, and Endeavour's STS-126 supply mission to the International Space Station has moved from Oct. 16 to Nov. 10.
New Water Reclamation System Headed for Duty on Space Station
International Space Station crews soon will have a new water reclamation system that will recycle wastewater, allowing up to six crew members to live aboard the orbiting laboratory.
ESA to recruit new European astronauts
With ESA astronauts working in the Columbus laboratory onboard the International Space Station (ISS) and the first of ESA’s new ATV cargo ships having delivered fresh supplies to the station, ESA’s human spaceflight activities have entered a new era. It is now time for ESA to seek out new talent to bolster its Astronaut Corps for future manned missions to the ISS, the Moon and beyond.
Expedition 17 Docks to International Space Station
Commander Sergei Alexandrovich Volkov and cosmonaut Oleg Dmitrievich Kononenko of the 17th International Space Station crew docked their Soyuz TMA-12 with the orbiting laboratory's Pirs Docking Compartment at 8:57 a.m. EDT Thursday, marking the beginning of their six-month stay aboard.
ATV Jules Verne automated ship docks to the ISS
ATV Jules Verne, the European Space Agency’s first resupply and reboost vehicle, has successfully performed a fully automated docking with the International Space Station (ISS). This docking marks the beginning of Jules Verne’s main servicing mission to deliver cargo, propellant, water, oxygen and propulsion capacity to the Station, as well as ESA’s entry into the restricted club of the partners able to access the orbital facility by their own means.